Projekti Shkolla e Vunoit u perfundua ne 5shtator 2008. Shoqata Outdoor Albania gjate sezonit veror 2008 realizoi me sukses projektin “Shkolla e Vunoit”. Ky  projekt u mundesua me mbeshtetjen e Komunitetit te Vunoit, drejtorise Arsimore te rrethit te Vlores, Bashkise se Himares, Ambasades Hollandeze, Zonjes dhe zotit Van Marlen si dhe komunitetit te te rinjve udhetare (Backpackers) nga e gjithe bota.Fale ketij bashkepunimi, gjate sezonit veror 2008 arritem te pastrojme te gjithe territorin rreth shkolles, rinovimin e tri banjove ekzistuese, instalimin e rrjetit elektrik dhe ujsjelles, rinovimin e mureve te shkolles nga jashte dhe nga brenda, lyerjen e mureve, vendosjen e dyerve te brendeshme te klasave si dhe rebilitimin e hapesirave te menduara per lule. Pas perfundimit te projektit u be e mundur qe shkolla te rihapet per sezonin shkollor 2008-2009 dhe aktualisht femijet e Vuniot zhvillojne mesimin ne keto ambjente. Ne perfundim iu dhura kesaj shkolle dhe nje kompjuter se bashku me nje printer.
 
Shkolla e Vunoit
The project “School of Vuno” ended on September 5th 2008. During the summer season, our association successfully carried out this project, which was made possible thanks to the precious support of the local community, the Board of Education of Vlora, the Municipality of Himara, the Royal Embassy of the Netherlands Embassy in Albania, Mr. And Mrs. Van Marlen as well as the whole community of young travelers that visited us from around the world.
The school of Vuno
May 2008 - September 2008
May 2008 - September 2008
project finished
before para after
mbas Jorgo painting the new classroom 
➛ Jorgo duke lyer klasen Ronaldo clearing the toilets from rocks
➛ Ronaldo duke pastruar banjet Kio and Joti digging for the new waterpipe
➛ Kio e Joti duke bere gropen per ujin
Thanks to this cooperation, during the summer of 2008 we managed to clean up the area surrounding the school, renovated three existing toilets, installed electricity and running water, restored and repainted the walls of the school, placed doors and rehabilitated green areas. After the end of the project the school reopened for the 2008 – 2009 school year. A computer and a printer were donated to the school at the end of the project.
 
⤴ toilets before the work
banjët para punës toilets after the work
banjët mbas punës classroom before & during the work klasa para dhe ndër punën classroom in & after the summer
klasa në dhe mbas verës C’të sheh syri, ta bën dora ➛ that what your eye sees is what your hand can do